
Add to Cart
12 16 20 Stations Mono Color Women Sport Shoes PVC Sole Making Machine JL-105
What we can supply for you?
1. The whole production line for making shoes, including machine, mold, material;
2. The advice on Factory building, factory management, production & package for shoes, layoout;
3. The service of machine oepration and shoes production;
4. The in-time after-sales service.
Features:
1. Material:Suitable for all kinds of thermoplastic raw materials, foaming or non-foaming, such as PVC and TPR.
2. PLC program control of industrial man-machine interface, full automatic operation.
3. The working statement is monitored all the while, for person to adjust the parameters easily.
4. Economy design, takes up small space, saving energy.
5. Only for produce one color soles.
Specifications | |||
Machine model | JL-105 | ||
Mould-clamping Unit | |||
Work station | 12/16/18/20/24/30 | ||
Clamping force | TON | 80/120 | |
Opening stroke | MM | 210 | |
Mould dimension | MM | 600*280 | |
Height of injection nozzle | MM | 280 | |
Injection Unit | |||
Injector | SET | 1 | |
Screw diameter | MM | 55/60/65/70 | |
Screw L/D ratio | L/D | 20 | |
Max.injection volume | cm3 | 500-1000 | |
Injection speed | Cm/s | 10 | |
Screw rotation speed | R.P.M | 0-200 | |
Electricity Consumption | Normal | Servo | |
Heating power of injector | KW | 7 | 7 |
Hydraulic unit motor | KW | 18.5 | 15.7+7.5 |
Total power | KW | 25.5 | 30.2 |
Temperature control | Section | 4 | 4 |
Power consumption per hour | Kw/h | 15-20 | 8-12 |
Dimension and Weight | 24 Stations | ||
Machine dimension | (L*W*H)MM | 4600*3600*2300 | |
Machine weight | KGS | 6000 | |
*Note:Above data only for reference. |
Payment Terms
For the first cooperation customer, we suggest T/T.
For some countries, we can make L/C.
Please negociated with us.
Machine Production Time
25-45 days after confirm deposit. Included the machine production time and machine test time.
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
After-sales Service
1. We will send technicians to buyer's factory for installation and training for 5-10days;
2. Our technicians will help you to install machine and works machine;
3. After the machine works well, our technicians will teach your workers how to produce shoes, and how to solve some emergency conditions.
4. After your workers can produce shoes very skilled, then our technicians back.
5. Also you can send your technicians to our factory for training.
6. Any questions can contact us, we will reply you within 24 hours.