
Add to Cart
12 / 16 Station Safety boot making machine rotary Table
Gumboots production line.jpg.pdf
Payment Terms
1. Negotiated, 30% T/T down payment , balance shall be paid before shipment by T/T.
Specifications
Machine model | JL-288 | JL-288-2C | |
Mould-clamping Unit | |||
Work station | 12,16 | 12,16 | |
Clamping force | TON | 220 | 220 |
Opening stroke | MM | 210 | 350 |
Mould dimension | MM | 420x320 | 650*260 |
Height of injection nozzle | MM | 280 | 650 |
Injection Unit | |||
Injector | SET | 1 | 2 |
Screw diameter | MM | 90/95 | 95/90,85/80 |
Screw L/D ratio | L/D | 19 | 19 |
Max.injection volume | cm3 | 1500-1700 | 1500-1700,800-950 |
Injection speed | Cm/s | 520 | 520 |
Screw rotation speed | R.P.M | 0-200 | 0-200 |
Electricity Consumption | |||
Heating power of injector | KW | 7 | 7*2 |
Hydraulic unit motor | KW | 22.5 | 22.5,18.5 |
Total electric consumption | KW | 29.5 | 55 |
Temperature control | Section | 4 | 4*2 |
Dimension and Weight | |||
Machine dimension | (L*W*H)MM | 5100*4900*2550 | 7600*4900*2550 |
Machine weight | KGS | 11000 | 18000 |
*Note:Above data only for reference. |
Applications:
1. Specialized in producing 1 color or 2 color full plastic boots or shoes.
2. Material: suitable for all kinds of thermoplastic raw material, foaming or non-foaming, such as PVC and TPR.
3. Equipped with Adopts industrialization human-computer interface, PLC controlling system, make the operation easily
4. Hydraulic system with double proportion, adjustable pressure and flow rate make products quality more steady.
5. Every stations are controlled by the PLC seperately, can put the moulds with different styles and sizes at the same time
Machine Production Time
25-45 days after confirm deposit.
Packing
Professional export package, plastic film packing, or Wooden case packing.
Shipping
By Sea, One Container for one machine
Delivery Terms
As per request: EXW, FOB, CIF for your option;
Guarantee
2 years. We provide 2 years guarantee time for all of our machine, it’s the longest time in China.
Four parts required for Shoes line:
1. Main shoes injection machine
2. Auxiliary equipment (Drying machine,Color mixer,Air compressor,Crusher,Cooling tower)
3. Shoes mold (which design you want make,customize mold)
for example, a design comes in 6 size from 35-40 for women,you need 6 pairs molds accordingly.
4. PVC material (try to find in local and also available in China )
After sell service:
Seller arrange technician engineer to Buyer’s for machine install and training for 7-10 days no need salary.
Buyer charge engineer’s translator.visa.round-trip ticket,food and hotel.
Over 10 days.Buyer should pay engineer daily 100 USD.
How many mold should i need?
Kindly note mold quantity depends on your design and each design how many size.
For example,if you got 3 designs,each design comes in 6 sizes, you need 18 pairs molds accordingly.
Usually one set of machine make 3 to 4 design is suitable.
Production Process
It need 1-3 people for the full process as follows:
Samples: